Contact us

Reference category: Technologies

BIOupgrade gas upgrading unit, Forssa Finland

Biovoima delivered a turnkey BIOupgrade processing unit based on membrane technology to the Forssa biogas plant. The gas processing unit is one of Finland's largest biomethane processing units in terms of capacity. At the Forssa plant, biomethane is processed from biogas produced from biowaste and sewage sludge for use in refueling vehicles...
Read more

Grid injection unit, SIA Greengas, Latvia

Biovoima is supplying Latvian company SIA Greengas with a grid connection solution, which is scheduled to be commissioned by the end of 2025. The BIOadapter grid connection solution operates as a dual-line system, with biomethane from two different biogas plants fed into a single grid connection unit. BIOadapter adjusts the gas pressure to suit the gas network...
Read more

Gas upgrading and refuelling station, SIA ZAAO, Latvia

Latvian waste management company SIA ZAAO has ordered a BIOupgrade gas processing unit and a biomethane filling station, BIOpark, from Biovoima. The project will be implemented in cooperation with construction company SIA Rubate. The Biovoima project team has begun the basic design of the project, and on-site installations have been planned...
Read more

BIOpark gas filling station, Voss Norway

Biovoima is supplying a gas filling station for the Voss biomethane plant currently under construction in Voss, Norway, in the Bergen region. The filling station will enable the biomethane produced at the plant to be used to fuel vehicles used for waste collection. The biomethane produced at the plant will be used as a 100% renewable fuel and in industry...
Read more

BIOadapter pressure reduction unit: Kokkola

Biovoima has completed the BIOadapter pressure reduction unit for Hycamite (Hycamite TCD Technologies Oy) in Kokkola. This was the first technology product manufactured by Biovoima at its own factory. “We are proud and satisfied with our own production process. The newly completed unit demonstrates that...
Read more

Stay up to date with the latest renewable energy news

"*" indicates required fields

This field is hidden when viewing the form

© 2026 Biovoima

Privacy policy